SynergyNDS Recovery completed repairs to various wastewater treatment equipment at Orange WCID #1, TX which were damaged by Hurricane Harvey in late 2017. As a result of the unprecedented amount of rainfall from Harvey, many control panels were inundated from flood waters shorting out capacitors, controls, switches, relays and motor/pumps. The TMLIRP Recovery Team worked diligently to repair and replace the damaged equipment throughout the treatment plant.
Orange WCID #1 - Various Equipment
Orange, TX
© 2024 — SynergyNDS